Skip to content
Mars Training Centre UK
Operations & Manufacturing

Manufacturing Plan to Shop Floor: Capacity Loading, Sequencing and Control Reviews Training Course

Helps manufacturing and planning leaders connect the sales plan, master schedule and daily sequence into one cycle that the floor can deliver.

Overview

Key Facts

Duration
1 Week
Format
Classroom and online
Cities
London, Rome, Trabzon, Vienna, New York, Doha and more
Next session
19 – 23 October 2026, London
Price
From 1,700 £

Programme Summary

Manufacturing plan to shop floor control is the subject of this one-week training course for manufacturing managers, production planning heads, plant managers and supply chain leaders, ending in a planning and control cycle design for one plant. Many plants run planning, scheduling and control as separate routines, so the schedule on the floor differs from the plan agreed in the office. The programme moves from one connected cycle, through diagnosis of breakdowns, to design of loading, sequencing and review routines. Mars Training Centre UK delivers this manufacturing plan to shop floor control programme for leaders from mixed organisations.

The Business Case

When the sales plan, the master schedule and the daily sequence are owned by different teams with different data, the plant responds to every change by expediting. Capacity is loaded beyond what the floor can deliver, inventory builds in the wrong places and delivery dates are promised that the schedule cannot meet. Leaders who connect the three levels find causes sooner and make commitments they can keep.

  • Schedule Adherence: Improves as sequences are built on loaded capacity and reviewed against actual output.
  • Inventory Balance: Strengthens as material plans follow a stable master schedule.
  • Delivery Reliability: Rises as promised dates reflect true capacity and open constraints.

Principles and Evidence Base

  • Sales and operations planning: It frames the monthly plan and the demand and supply review practised in Sessions 1 and 3.
  • Master production scheduling with material requirements planning: It guides the schedule and material plan built in Session 3.
  • Rough-cut and finite capacity planning: It structures the capacity loading and constraint checks in Sessions 2 and 3.
  • Shop floor control with performance review: It supports the daily and weekly review routines in Session 4.

Intended Participants

  • Manufacturing managers who answer for output, cost and delivery.
  • Production planning heads who own the master schedule and material plan.
  • Plant managers who balance capacity and inventory.
  • Supply chain leaders who commit delivery dates to customers.

Learning Outcomes

  1. Participants will be able to distinguish the roles of the sales plan, the master schedule and the shop floor sequence.
  2. Participants will be able to diagnose why plans break down between office and floor.
  3. Participants will be able to construct a capacity loading view that exposes overloads before release.
  4. Participants will be able to evaluate sequencing rules against delivery, changeover and inventory effects.
  5. Participants will be able to prioritise control reviews and escalation rules.
  6. Participants will be able to justify a planning and control cycle design to executive colleagues.

Programme Structure

Day 1: Manufacturing Plan to Shop Floor Control and the Planning Hierarchy

How do the sales plan, master schedule and floor sequence fit together?

  • Planning Hierarchy Map
  • Sales and Operations Planning Cycle Chart
  • Master Schedule Role Sheet
  • Planning Horizon and Frozen Zone Table
  • Decision Rights Chart

Day 2: Diagnosing Plan Breakdowns

Where and why does the plan stop matching the floor?

  • Plan Versus Actual Variance Review
  • Schedule Change Log Analysis
  • Rough-Cut Capacity Check
  • Data Accuracy Audit Sheet
  • Expediting Cause Tree

Day 3: Designing Loading, Sequencing and Material Plans

How are capacity, sequence and materials set so the plan can be met?

  • Finite Capacity Loading Board
  • Sequencing Rule Comparison Table
  • Master Schedule Material Worksheet
  • Changeover Trade-Off Grid
  • Order Release Rule Set

Day 4: Control Routines, Reviews and Escalation

How is execution tracked and corrected without constant rework?

  • Daily Production Review Format
  • Weekly Output Dashboard
  • Escalation Ladder
  • Constraint and Shortage Watch List
  • Schedule Change Approval Form

Day 5: Applying Manufacturing Plan to Shop Floor Control to One Plant

Does the cycle design hold when tested against every earlier session?

  • Applying the Session 1 Hierarchy Map to the Plant
  • Testing the Session 2 Variance Review on Live Data
  • Comparing the Session 3 Sequencing Options on Delivery and Cost
  • Rehearsing the Session 4 Daily Review
  • Completing the Planning and Control Cycle Design

Methodology

The programme uses a structured exercise method built on anonymised order books, capacity tables, schedules and short written cases from food, consumer goods and engineering plants. Participants work in small groups on one plant, load capacity, test sequences and defend choices to peers who act as sales and finance colleagues.

  • Suggested activity: Loading a week of orders onto a finite capacity board and resolving the overloads.
  • Suggested activity: Comparing two sequencing rules on delivery, changeover and inventory.
  • Suggested activity: Running a mock daily review.

Capstone Output

Each participant completes a planning and control cycle design for one plant. It holds a planning hierarchy, a capacity loading view, a sequencing rule set, a review and escalation routine and a measure set. The design is used at work to agree the planning calendar with sales and finance colleagues and to brief shop floor supervisors.

Frequently Asked Questions

Is manufacturing plan to shop floor control suitable for managers who have not run a planning team before?

Yes. Manufacturing plan to shop floor control is taught from first principles and assumes responsibility for output, planning or delivery, not earlier scheduling experience.

Which models does manufacturing plan to shop floor control rest on in this programme?

Manufacturing plan to shop floor control here rests on sales and operations planning, master production scheduling with material requirements planning, rough-cut and finite capacity planning and shop floor control.

How is the cycle design from manufacturing plan to shop floor control used at work?

You use the cycle design to agree the planning calendar with sales and finance, set loading and sequencing rules and brief shop floor supervisors.

How does manufacturing plan to shop floor control differ from a programme on inventory management?

Manufacturing plan to shop floor control centres on matching plans, schedules and execution, while inventory management centres on stock levels, replenishment and storage.

  • Course Mode full-time
  • Provider Mars Training Centre UK
Schedule

All dates and locations

Compare dates and destinations, then choose your session. Fees are per participant.

Scheduled dates
34
Destinations
24
Reset filters
Showing 1-20 of 34 events
Location Dates Duration Mode Price Actions
London 19 – 23 October 2026 1 Week Onsite £4,300
Rome 2 – 6 November 2026 1 Week Onsite £5,500
Trabzon 16 – 20 November 2026 1 Week Onsite £4,800
Vienna 23 – 27 November 2026 1 Week Onsite £5,500
New York 30 November – 4 December 2026 1 Week Onsite £7,900
Doha 13 – 17 December 2026 1 Week Onsite £4,300
London 21 – 25 December 2026 1 Week Onsite £4,300
Cape town 21 – 25 December 2026 1 Week Onsite £4,800
Tokyo 28 December 2026 – 1 January 2027 1 Week Onsite £6,900
Istanbul 18 – 22 January 2027 1 Week Onsite £4,300
Amsterdam 15 – 19 February 2027 1 Week Onsite £4,800
Manama 21 – 25 February 2027 1 Week Onsite £4,300
Dubai 1 – 5 March 2027 1 Week Onsite £4,000
Milan 8 – 12 March 2027 1 Week Onsite £5,500
Kuala Lumpur 28 March – 1 April 2027 1 Week Onsite £4,000
Muscat 28 March – 1 April 2027 1 Week Onsite £4,300
London 5 – 9 April 2027 1 Week Onsite £4,300
Cairo 11 – 15 April 2027 1 Week Onsite £3,100
Madrid 19 – 23 April 2027 1 Week Onsite £4,800
Geneva 26 – 30 April 2027 1 Week Onsite £5,500

Frequently asked questions

What does this course cover?

Programme SummaryManufacturing plan to shop floor control is the subject of this one-week training course for manufacturing managers, production planning heads, plant managers and supply chain leaders, ending in a planning and control cycle design for one plant. Many plants run planning, scheduling and control as separate routines, so the schedule on the…

Are training dates available?

Yes. Available dates and destinations are listed in the course dates section on this page.

How can I register?

Choose an available date on this page and complete the registration form, or send a programme enquiry.

Can I download the course brochure?

Yes. Use the brochure download link provided on this page.