Skip to content
Mars Training Centre UK
Operations & Manufacturing

Production Line Performance: Line Balancing, Changeover Reduction and Process Control Course

For plant, production and operations managers who must raise line output by balancing work, cutting changeover time and controlling process variation.

Overview

Key Facts

Duration
1 Week
Format
Classroom and online
Cities
Dubai, Cape town, Rome, Paris, London, Istanbul and more
Next session
19 – 23 October 2026, Dubai
Price
From 1,700 £

Programme Summary

Production line performance is the subject of this one-week training course for plant, production and operations managers who run manufacturing lines, ending in a production line performance plan for one line. Output losses persist when changeovers, line balance and process variation are managed by habit. The programme moves from flow principles through diagnosis of line losses to design of controls, then applies them to one line. Mars Training Centre UK delivers this production line performance programme for managers from mixed industries.

The Business Case

A line that is slightly unbalanced or slow to change over loses hours every week, and the loss rarely appears in one report. When stoppages are explained anecdotally, effort goes to the loudest problem rather than the largest one. Managers who measure losses by cause and design controls around them recover capacity without new equipment.

  • Changeover Time: Falls as setup tasks are separated into those done while the line runs and those done while it stops.
  • Line Balance: Improves as work is distributed against takt time so that no station sets the pace by accident.
  • Process Stability: Rises as variation is monitored with control charts before it becomes scrap.

Principles and Evidence Base

  • SMED: Its method of converting internal setup work to external work shapes the changeover analysis in Session 3 and the redesign in Session 4.
  • Lean: Its flow and waste concepts frame the line mapping in Session 1 and the balancing work in Session 4.
  • Statistical Process Control: Its control charts structure the variation review in Session 2 and the monitoring plan in Session 4.
  • ISO 9001: Its process approach and corrective action requirements guide the control design in Session 4.

Intended Participants

  • Plant managers who answer for output, cost and delivery on one or more lines.
  • Production managers who plan shifts, changeovers and staffing.
  • Operations managers who coordinate maintenance, quality and planning with production.
  • Continuous improvement leads who support line teams with analysis.

Typical settings include food, packaging, automotive components and consumer goods plants.

Learning Outcomes

  1. Participants will be able to describe how flow, takt time and waste shape production line performance.
  2. Participants will be able to diagnose the main causes of stoppage, speed loss and defect on a line.
  3. Participants will be able to analyse changeover tasks and classify them as internal or external.
  4. Participants will be able to evaluate line balance against takt time and propose redistribution of work.
  5. Participants will be able to construct control charts and a monitoring plan for critical process parameters.
  6. Participants will be able to justify a production line performance plan to plant leadership.

Programme Structure

Day 1: Line Performance Principles and Flow

What does a well-run line deliver, and how is its performance measured?

  • Line Output and Loss Table
  • Value Stream Map
  • Takt Time Calculation Sheet
  • Lean Waste Checklist
  • Line Layout Sketch

Day 2: Diagnosing Line Losses and Variation

Where does capacity disappear, and is the process stable enough to improve?

  • Stoppage Pareto Chart
  • Speed Loss Observation Sheet
  • Defect Cause Tree
  • Statistical Process Control Chart
  • Shift Handover Review

Day 3: Diagnosing Changeover and Line Balance

Which setup tasks and station imbalances hold the line back?

  • Changeover Video Review
  • SMED Task Classification Sheet
  • Station Cycle Time Chart
  • Operator Balance Chart
  • Bottleneck Station Analysis

Day 4: Designing Controls and Improvements

What changes and controls keep the gains in place?

  • Changeover Standard Work Sheet
  • Rebalanced Work Allocation Table
  • Control Chart Monitoring Plan
  • ISO 9001 Corrective Action Record
  • Daily Line Review Board

Day 5: Applying Improvement to One Line

Does the plan hold when it is tested on one line?

  • Applying the Session 2 Loss Analysis to a Live Line
  • Testing the Session 3 Changeover Redesign
  • Checking the Session 4 Monitoring Plan
  • Revising the Plan after Peer Feedback
  • Completing the Production Line Performance Plan

Methodology

The programme uses a case analysis method built on anonymised line data, changeover recordings and short written cases from manufacturing plants. Participants work in small groups on one line, defend choices to peers who act as plant leadership, maintenance and quality colleagues, and receive facilitator feedback.

  • Suggested activity: Classifying the tasks of a forty-minute changeover.
  • Suggested activity: Rebalancing a six-station assembly line.
  • Suggested activity: Reading a control chart that signals drift.

Capstone Output

Each participant completes a production line performance plan for one line. It holds a loss analysis, a changeover redesign, a rebalanced work allocation, a monitoring plan and a corrective action routine. The plan is used at work to brief the line team, secure leadership support and guide weekly reviews.

Frequently Asked Questions

Is production line performance suitable for managers without an engineering background?

Yes. Production line performance is taught from first principles and assumes responsibility for output, not engineering training.

Which methods does production line performance rest on in this programme?

Production line performance here rests on SMED, Lean, Statistical Process Control and ISO 9001.

How is the production line performance plan used at work?

You use the production line performance plan to brief the line team, obtain leadership support and structure weekly reviews.

How does production line performance differ from a programme on maintenance management?

Production line performance centres on flow, changeover and process control, while maintenance management centres on asset reliability and repair planning.

  • Course Mode full-time
  • Provider Mars Training Centre UK
Schedule

All dates and locations

Compare dates and destinations, then choose your session. Fees are per participant.

Scheduled dates
34
Destinations
24
Reset filters
Showing 1-20 of 34 events
Location Dates Duration Mode Price Actions
Dubai 19 – 23 October 2026 1 Week Onsite £4,000
Cape town 26 – 30 October 2026 1 Week Onsite £4,800
Rome 30 November – 4 December 2026 1 Week Onsite £5,500
Paris 7 – 11 December 2026 1 Week Onsite £5,500
Zoom 20 – 24 December 2026 1 Week Online £1,700
London 28 December 2026 – 1 January 2027 1 Week Onsite £4,300
Istanbul 4 – 8 January 2027 1 Week Onsite £4,300
Manama 17 – 21 January 2027 1 Week Onsite £4,300
Milan 25 – 29 January 2027 1 Week Onsite £5,500
Kuala Lumpur 31 January – 4 February 2027 1 Week Onsite £4,000
London 15 – 19 February 2027 1 Week Onsite £4,300
Amsterdam 22 – 26 February 2027 1 Week Onsite £4,800
Cairo 28 February – 4 March 2027 1 Week Onsite £3,100
Muscat 21 – 25 March 2027 1 Week Onsite £4,300
Casablanca 29 March – 2 April 2027 1 Week Onsite £4,000
Sharm El-Sheikh 4 – 8 April 2027 1 Week Onsite £4,000
Barcelona 12 – 16 April 2027 1 Week Onsite £4,800
Doha 18 – 22 April 2027 1 Week Onsite £4,300
Kuala Lumpur 25 – 29 April 2027 1 Week Onsite £4,000
Madrid 10 – 14 May 2027 1 Week Onsite £4,800

Frequently asked questions

What does this course cover?

Programme SummaryProduction line performance is the subject of this one-week training course for plant, production and operations managers who run manufacturing lines, ending in a production line performance plan for one line. Output losses persist when changeovers, line balance and process variation are managed by habit. The programme moves from flow pri…

Are training dates available?

Yes. Available dates and destinations are listed in the course dates section on this page.

How can I register?

Choose an available date on this page and complete the registration form, or send a programme enquiry.

Can I download the course brochure?

Yes. Use the brochure download link provided on this page.